Hospital Roof Leak
Hamilton, ON
Client: Retrach Engineering Ltd.
Date: 2008

During the construction of a new addition to this Hospital, rainwater penetrated a temporary roof barrier, damaging the existing interior below.  All related architectural and structural drawings, specifications, photographs and shop drawings were diligently reviewed and analyzed.  Our findings were valuable in owner-to-contractor negotiations and instrumental in resolving the dispute.